Steel Building Fire Risk Assessment: Guide

Steel Building Fire Risk Assessment: Guide

Steel doesn’t burn, but that doesn’t make a steel building fire-resistant. I recommend checking fire risks before you order a kit, approve plans, or change the building’s use.

My assessment checklist covers four steps:

  1. Record the use: Note floor area, occupant count, stored goods, and existing fire protection.
  2. Map fuels and ignition sources: Check storage, combustible dust, wiring, heaters, batteries, and hot work.
  3. Review protection and access: Have qualified professionals check rated assemblies, steel-member protection, sprinklers, alarms, exits, and fire-department access.
  4. Confirm local rules and corrections: Check adopted codes with local officials, assign fixes, and document approvals.

One detail I wouldn’t overlook: hot-work sparks can travel 35 feet or more – a screening distance, not a substitute for required safeguards.

Before purchasing, I’d also get <u>written confirmation of what the quote includes and excludes</u>, including fire protection, engineering, foundations, and added structural loads.

Steel Building Fire Risk Assessment: 4 Steps

Steel Building Fire Risk Assessment: 4 Steps

Fire Resistance Design for Metal Building Systems Part 1

Step 2: List Fuels and Ignition Sources

Map fuels and ignition sources by zone. Mark each room, bay, utility area, and outdoor storage area on a floor plan, along with people and critical equipment exposed to nearby hazards. Photograph representative conditions, and account for temporary storage and seasonal peaks – not just what’s there on inspection day. In the next step, use this map to compare hazards with the layout, fire separation, and access.

Record Combustible and Hazardous Materials

Record cardboard, plastics, wood products, textiles, biomass, fuels, chemicals, batteries, compressed gases, and waste in each zone. For each item, note its product name, physical form, container type, quantity, storage height, arrangement, and location. Keep safety data sheets where applicable, and flag materials that need special separation, quantity limits, or storage controls.

Use quantities and storage patterns to spot concentrated fuel loads. Have a qualified fire-protection professional calculate fire load density when needed for design, code, sprinkler, insurance, or occupancy decisions.

In dust-prone zones, check beams, ledges, equipment, ducts, filters, and collectors for combustible dust. Record housekeeping frequency, dust collection, ventilation, ignition controls, and existing explosion venting or suppression.

Don’t judge dust explosibility by appearance alone. Obtain a qualified assessment, including testing or a dust-hazard analysis when warranted. NFPA 660 now consolidates prior combustible-dust guidance; follow the edition adopted locally.

Next, check ignition sources near the fuels you’ve listed in each zone.

Locate Electrical, Heating, and Hot-Work Hazards

Mark electrical equipment, extension cords, battery chargers, heaters, lighting, engines, exhaust systems, cooking appliances, and hot-work areas in each zone. Measure clearances to nearby combustibles and compare them with equipment instructions and applicable requirements.

Record damaged wiring, overloaded circuits, fuel leaks, blocked ventilation, and chargers near combustibles. Note battery types, damaged or overheating batteries, and charging safeguards. Refer electrical defects to a qualified electrician.

For hot work, check permits, combustible removal or shielding, extinguishers, and fire-watch arrangements during and after work. Inspect concealed spaces and the opposite side of partitions. OSHA training material states that hot-work sparks and slag can travel 35 feet or more and may pass through openings. Use that distance as a screening aid – not as a substitute for permit conditions or adopted requirements.

Stop uncontrolled hot work. Have qualified personnel isolate leaking fuel or unsafe electrical equipment, and keep work shut down until the problems are corrected.

Step 3: Review Layout, Fire Protection, and Access

After mapping fuels and ignition sources, check how fire could spread and how emergency crews would reach the building. On the scaled floor plan and site plan, mark rooms, equipment, storage, exit routes, and emergency access. Show the full footprint of vehicles and equipment, including working clearances.

Check Fire Separations and Rated Assemblies

Use the plan to check barriers that limit fire spread. Mark room boundaries, utilities, doors, windows, joints, and penetrations. Then have a qualified designer verify the required fire ratings and confirm that rated walls, doors, penetrations, and steel-member protection meet them.

Compare Fire Protection for Steel Members

Have a qualified designer select the protection needed for steel members to meet the required fire-resistance rating.

Check Sprinklers, Alarms, and Extinguishers

Check the active systems that limit fire growth and spread. Mark existing protection and note anything missing, undersized, or out of service. Sprinkler requirements depend on occupancy and building size, not steel framing alone.

Have qualified professionals confirm that these systems suit specific hazards, such as chemical storage or high-density occupancy. These risks are particularly relevant for steel shop buildings used for industrial work. These conditions may require specialized engineering reviews. Keep inspection, testing, and maintenance records for sprinklers, alarms, and extinguishers up to date.

Verify Exits and Fire-Department Access

Confirm that the building has at least two exits, spaced so a single fire cannot block both. On the site plan, mark fire-department apparatus access, including access lanes, truck circulation, road width, and clearances.

Step 4: Confirm Codes and Record Corrective Actions

With hazards mapped and protection checked, use your findings to obtain required permits, stamped drawings, and licensed professional review before work starts.

Ask the Authority Having Jurisdiction (AHJ) which IBC and IFC editions apply. Confirm which permits and approvals your occupancy, fuel load, layout, protection, or proposed changes require. Don’t assume the latest edition applies. This review determines what needs approval before fabrication or field work begins.

Chapter 22 of the 2024 IBC covers steel-specific requirements. Back up the review with approved plans, calculations, listings, test reports, inspection records, and equipment documents – not just kit specs.

Create an Assessment Record and Action Log

For each fire-risk finding, record the hazard, required correction, and closure status. Assign responsibility for design, fabrication, construction, and inspection. Use model numbers, brand names, and material values or ratings rather than generic descriptions. Verify code requirements with local officials, and close the permit only after the final inspection is approved.

Conclusion: Address Fire Risks Before Ordering or Changing Use

Finalize the project scope using the completed fire-risk assessment before you order. Before ordering or changing use, confirm that the design matches the assessment. Have qualified design professionals resolve fire-critical requirements and verify local code requirements before you finalize kit specifications. Account for sprinkler loads and any other added structural loads in the initial design.

Use the assessment findings to request pricing and define the kit scope. When requesting a quote through Price Buildings, provide the dimensions, intended use, door locations, insulation, and documented fire-safety requirements. Mark exit routes and vehicle paths as no-obstruction zones on the layout so designers can coordinate bracing around them.

Before approving the quote, confirm exactly what it covers. A quote alone does not confirm scope. Get written confirmation of whether the scope includes fire protection systems, rated assemblies, site-specific engineering, foundations, grading, and slab work. Don’t assume the kit price includes these items. Get every exclusion in writing before purchasing.

FAQs

How often should I reassess my steel building’s fire risks?

Make regular fire-risk checks part of routine building maintenance. Inspect panels, seams, fasteners, and protective coatings for wear or damage. Check with your local building or planning department for code updates to keep your building compliant.

If the building’s use changes – especially to higher-risk activities – reassess fire requirements immediately to make sure your systems still meet those needs.

Does converting my barn into a shop change fire requirements?

Yes. Converting a barn into a shop typically changes its occupancy classification and fire requirements. If customers or employees will use the space, you may need upgrades such as fire sprinklers, which can cost $2.00–$5.00 per square foot.

Before work begins, check with your fire marshal or building department to confirm the occupancy classification and local fire code requirements. This can help you avoid costly retrofits later.

Who is qualified to assess my building’s fire risks?

Check with your local building department or city planning office to confirm which fire codes apply to your project, its intended use, and its location. Before signing any contracts, ask your supplier for a list of codes the building meets. Then verify that list with local officials.

Licensed professional engineers who stamp your site-specific design drawings can certify that the structural plans meet local fire safety and building codes.